River Bollin polluted by sewage 1,040 times in 2024 - lasting 6,434 hours

© OpenStreetMap contributors
Contains OS Data © Crown copyright & database right 2021-2024
© Top of the Poops 2021-2024
Totals for River Bollin in 2024
20 Sites polluted by United Utilities
1,040 sewage dumps
6,434 h duration
That's 8.94 months. On average 2.8 times a day

Pollution Summary 2024

Here are all the reported sewage overflow totals for River Bollin in 2024. Sometimes sewage can be being dumped for months at a time.

These numbers are very slightly different from the Rivers page. We're working on it.

Company Waterway Site Sewage Dumps Duration (Hours) Reporting %
United Utilities River Bollin MACCLESFIELD WWTW 140 1,851 100
United Utilities River Bollin BOWDON WASTEWATER TREATMENT WORKS 134 1,395 100
United Utilities River Bollin HALE STORM TANKS & PUMPING STATION 100 1,038 99.95
United Utilities River Bollin PARK ROAD ARTHOG ROAD CSO 452LS 128 488 98.7
United Utilities River Bollin CSO AT 18/20 BEECH FARM DRIVE 73 379 82.9
United Utilities River Bollin POOL BANK FARM BOWDON CSO 452L6 89 353 95.4
United Utilities River Bollin DUNHAM MASSEY STW 60 238 100
United Utilities River Bollin GREEN DRAGON HOTEL CSO 481EC 37 189 98.2
United Utilities River Bollin WESTMINSTER ROAD CSO 77 145 100
United Utilities River Bollin BARROW LANE CSO (451G7) 57 85 99.1
United Utilities River Bollin CHANCEL LANE CSO 271I4 51 81 99
United Utilities River Bollin HIBEL ROAD CSO 27075 15 55 100
United Utilities River Bollin ROEWOODS OUTFALL SEWER 30 49 95.5
United Utilities River Bollin QUARRY BANK MILL CSO 272M4 14 37 99
United Utilities River Bollin BOLLIN WALK CSO 27074 20 33 100
United Utilities River Bollin BEECH BRIDGE SOUTH CSO 2 7 75
United Utilities River Bollin OPP RIVER ST CSO (273BY) 3 3 88.7
United Utilities River Bollin WATERS GREEN (DAMS VALLEY) CSO 6 1 99.7
United Utilities River Bollin CARTMEL CLOSE CSO 3 0 99
United Utilities River Bollin CHAPEL LANE 1 0 94
United Utilities River Bollin WILMSLOW PARK SOUTH CSO 0 0 98.2
United Utilities River Bollin THE CARRS COMBINED SEWER OVERFLOW 0 0 99.2

Data Sources & Accuracy

EDM (Event Duration Monitoring) data and Consented Discharges to Controlled Waters with Conditions from Environment Agency & Data Map Wales, and Scottish Water

Experimental derived data from Thames Water API, Some data may be missing or inaccurate. This uses Environment Agency rainfall data from the real-time data API (Beta) - Rainfall data is delayed by up to two days.

This website is intended to provide an accurate representation of the Environment Agency data. The data is hard to use, and thus some errors may have been made. If you find something that is incorrect, please raise an issue at the GitHub issues page and we'll endeavour to fix it quickly.

This project is not associated, approved or endorsed by any of the companies whose logos you see here.