Thurrock was polluted by sewage 47 times in 2023
lasting 102 hours

© OpenStreetMap contributors
Contains OS Data © Crown copyright & database right 2021-2023
© Top of the Poops 2021-2023
✔ means we have experimental daily data since 2023
Totals for Thurrock in 2023
2 Sites polluted by Anglian Water
47 sewage dumps
102 h duration
That's 4.25 days. 3.9 times a month, over the year
Change Over Time
Take Action
Your local MP is Jennifer Craft (Labour) - Find out more about their interests, donors, and voting at They Work For You

Pollution Summary 2023

Here are all the reported sewage overflow totals for Thurrock in 2023. Sometimes sewage can be being dumped for months at a time.

Reporting refers to how much of the time the monitoring was active. In this constituency 0 of the total 3 CSO locations had reporting enabled for less than half the year, of which 0 had zero reporting.

Company Waterway Site Sewage Dumps Duration (Hours) Reporting %
Anglian Water Thames Estuary TILBURY WATER RECYCLING CENTRE 44 95 99.6
Anglian Water Mardyke STIFFORD - CORRAN WAY PS 3 7 100
Anglian Water River Thames Tidal WEST THURROCK PUMPING STATION, WEST 0 0 100

Data Sources & Accuracy

EDM (Event Duration Monitoring) data and Consented Discharges to Controlled Waters with Conditions from Environment Agency & Data Map Wales, and Scottish Water

Experimental derived data from Thames Water API, Some data may be missing or inaccurate. This uses Environment Agency rainfall data from the real-time data API (Beta) - Rainfall data is delayed by up to two days.

This website is intended to provide an accurate representation of the Environment Agency data. The data is hard to use, and thus some errors may have been made. If you find something that is incorrect, please raise an issue at the GitHub issues page and we'll endeavour to fix it quickly.

This project is not associated, approved or endorsed by any of the companies whose logos you see here.