South Basildon and East Thurrock polluted by sewage 96 times in 2023 - lasting 719 hours

© OpenStreetMap contributors
Contains OS Data © Crown copyright & database right 2021-2023
© Top of the Poops 2021-2023
✔ means we have experimental daily data since 2023
Totals for South Basildon and East Thurrock in 2023
5 Sites polluted by Anglian Water
96 sewage dumps
719 h duration
That's 29.96 days. 1.8 times a week, on average
Change Over Time

Pollution Summary 2023

Here are all the reported sewage overflow totals for South Basildon and East Thurrock in 2023. Sometimes sewage can be being dumped for months at a time.

Reporting refers to how much of the time the monitoring was active. In this constituency 0 of the total 5 CSO locations had reporting enabled for less than half the year, of which 0 had zero reporting.

Company Waterway Site Sewage Dumps Duration (Hours) Reporting %
Anglian Water North Benfleet Brook ELM ROAD SPS 26 289 100
Anglian Water Pitsea Creek BASILDON WATER RECYCLING CENTRE 24 201 100
Anglian Water Stanford Creek: Tidal River Thames STANFORD LE HOPE STW, STANFORD LE H 30 123 100
Anglian Water Drainage Channel River Thames E TILBURY BATA (LINFORD) 6 77 100
Anglian Water Timbermans Creek PITSEA WRC 10 27 77.5

Data Sources & Accuracy

EDM (Event Duration Monitoring) data and Consented Discharges to Controlled Waters with Conditions from Environment Agency & Data Map Wales

Experimental derived data from Thames Water API, Some data may be missing or inaccurate. This uses Environment Agency rainfall data from the real-time data API (Beta) - Rainfall data is delayed by up to two days.

This website is intended to provide an accurate representation of the Environment Agency data. The data is hard to use, and thus some errors may have been made. If you find something that is incorrect, please raise an issue at the GitHub issues page and we'll endeavour to fix it quickly.

This project is not associated, approved or endorsed by any of the companies whose logos you see here.