Culverted River Aire polluted by sewage 121 times in 2023 - lasting 160 hours

© OpenStreetMap contributors
Contains OS Data © Crown copyright & database right 2021-2023
© Top of the Poops 2021-2023
Totals for Culverted River Aire in 2023
3 Sites polluted by Yorkshire Water
121 sewage dumps
160 h duration
That's 6.67 days. 2.3 times a week, on average
Constituencies along Culverted River Aire

Pollution Summary 2023

Here are all the reported sewage overflow totals for Culverted River Aire in 2023. Sometimes sewage can be being dumped for months at a time.

These numbers are very slightly different from the Rivers page. We're working on it.

Company Waterway Site Sewage Dumps Duration (Hours) Reporting %
Yorkshire Water Culverted River Aire SPEN LANE 184 CSO 37 63 99.8
Yorkshire Water Culverted River Aire VESPER ROAD CSO 50 58 100
Yorkshire Water Culverted River Aire HEADINGLEY STATION CSO 34 38 100
Yorkshire Water Culverted River Aire MORRIS LANE CSO 0 0 100
Yorkshire Water Culverted River Aire SPEN LANE 185 CSO 0 0 0

Data Sources & Accuracy

EDM (Event Duration Monitoring) data and Consented Discharges to Controlled Waters with Conditions from Environment Agency & Data Map Wales, and Scottish Water

Experimental derived data from Thames Water API, Some data may be missing or inaccurate. This uses Environment Agency rainfall data from the real-time data API (Beta) - Rainfall data is delayed by up to two days.

This website is intended to provide an accurate representation of the Environment Agency data. The data is hard to use, and thus some errors may have been made. If you find something that is incorrect, please raise an issue at the GitHub issues page and we'll endeavour to fix it quickly.

This project is not associated, approved or endorsed by any of the companies whose logos you see here.