Shotton Beck, polluted by sewage 47 times in 2025 - lasting 124 hours

Marker shade
© OpenStreetMap contributors
Contains OS Data © Crown copyright & database right 2021-2024
© Top of the Poops 2021-2024
Totals for Shotton Beck, in 2025
3 Sites polluted by Northumbrian Water
47 sewage dumps
124 h duration
That's 5.17 days. 3.9 times a month, over the year
Constituencies along Shotton Beck,
Places along Shotton Beck,

Pollution Summary 2025

Here are all the reported sewage overflow totals for Shotton Beck, in 2025. Sometimes sewage can be being dumped for months at a time.

Company Waterway Site Sewage Dumps Duration (Hours) Reporting %
Northumbrian Water Shotton Beck, SEDGEFIELD SEWAGE TREATMENT WORKS 15 77 99
Northumbrian Water Shotton Beck STOCKTON ROAD CSO (SE 024) 28 44 99.7
Northumbrian Water Shotton Beck THE MEADOWS CSO (SE 022) 4 2 91.2

Data Sources & Accuracy

EDM (Event Duration Monitoring) data and Consented Discharges to Controlled Waters with Conditions from Environment Agency & Data Map Wales, and Scottish Water

Experimental derived data from Thames Water API, Some data may be missing or inaccurate. Live sewage data from Stream Water API

Annual figures up to and including 2025 come from official water company returns. The 2026 figure is our own estimate, derived continuously from the companies' live data feeds.

Uses Environment Agency rainfall data from the real-time data API (Beta) - Rainfall data is delayed by up to two days.

This website is intended to provide an accurate representation of the Environment Agency data. The data is hard to use, and thus some errors may have been made. If you find something that is incorrect, please raise an issue at the GitHub issues page and we'll endeavour to fix it quickly.

This project is not associated, approved or endorsed by any of the companies whose logos you see here.