Sturton Beck River Till polluted by sewage 49 times in 2025 - lasting 395 hours

Marker shade
© OpenStreetMap contributors
Contains OS Data © Crown copyright & database right 2021-2024
© Top of the Poops 2021-2024
Totals for Sturton Beck River Till in 2025
1 Sites polluted by Anglian Water
49 sewage dumps
395 h duration
That's 2.35 weeks. 4.1 times a month, over the year
Constituencies along Sturton Beck River Till
Places along Sturton Beck River Till

Pollution Summary 2025

Here are all the reported sewage overflow totals for Sturton Beck River Till in 2025. Sometimes sewage can be being dumped for months at a time.

Company Waterway Site Sewage Dumps Duration (Hours) Reporting %
Anglian Water Sturton Beck River Till STURTON BY STOW STW 49 395 98.3

Data Sources & Accuracy

EDM (Event Duration Monitoring) data and Consented Discharges to Controlled Waters with Conditions from Environment Agency & Data Map Wales, and Scottish Water

Experimental derived data from Thames Water API, Some data may be missing or inaccurate. Live sewage data from Stream Water API

Annual figures up to and including 2025 come from official water company returns. The 2026 figure is our own estimate, derived continuously from the companies' live data feeds.

Uses Environment Agency rainfall data from the real-time data API (Beta) - Rainfall data is delayed by up to two days.

This website is intended to provide an accurate representation of the Environment Agency data. The data is hard to use, and thus some errors may have been made. If you find something that is incorrect, please raise an issue at the GitHub issues page and we'll endeavour to fix it quickly.

This project is not associated, approved or endorsed by any of the companies whose logos you see here.