River Witham polluted by sewage 304 times in 2024 - lasting 3,802 hours

© OpenStreetMap contributors
Contains OS Data © Crown copyright & database right 2021-2024
© Top of the Poops 2021-2024
Totals for River Witham in 2024
8 Sites polluted by Anglian Water
304 sewage dumps
3,802 h duration
That's 5.28 months. 5.8 times a week, on average

Pollution Summary 2024

Here are all the reported sewage overflow totals for River Witham in 2024. Sometimes sewage can be being dumped for months at a time.

These numbers are very slightly different from the Rivers page. We're working on it.

Company Waterway Site Sewage Dumps Duration (Hours) Reporting %
Anglian Water River Witham LONG BENNINGTON STW 88 1,250 100
Anglian Water River Witham MARSTON (GRANTHAM) WRC 54 808 94.2
Anglian Water River Witham CLAYPOLE STW 57 702 99.1
Anglian Water River Witham BASSINGHAM WATER RECYCLING CENTRE 57 591 100
Anglian Water River Witham NORTH HYKEHAM WATER RECYCLING CENTR 26 284 79.4
Anglian Water River Witham NORTH WITHAM TPS 9 127 100
Anglian Water River Witham COLSTERWORTH STW 11 37 100
Anglian Water River Witham GRANTHAM - BRIDGE END GROVE CSO 2 0 99.7
Anglian Water River Witham BARDNEY WATER RECYCLING CENTRE 0 0 100

Data Sources & Accuracy

EDM (Event Duration Monitoring) data and Consented Discharges to Controlled Waters with Conditions from Environment Agency & Data Map Wales, and Scottish Water

Experimental derived data from Thames Water API, Some data may be missing or inaccurate. This uses Environment Agency rainfall data from the real-time data API (Beta) - Rainfall data is delayed by up to two days.

This website is intended to provide an accurate representation of the Environment Agency data. The data is hard to use, and thus some errors may have been made. If you find something that is incorrect, please raise an issue at the GitHub issues page and we'll endeavour to fix it quickly.

This project is not associated, approved or endorsed by any of the companies whose logos you see here.