BLUE ANCHOR WEST polluted by sewage 303 times in 2023 - lasting 3,029 hours

© OpenStreetMap contributors
Contains OS Data © Crown copyright & database right 2021-2023
© Top of the Poops 2021-2023
Totals for BLUE ANCHOR WEST in 2023
7 Sites polluted by Wessex Water
303 sewage dumps
3,029 h duration
That's 4.21 months. 5.8 times a week, on average
How does BLUE ANCHOR WEST compare?

BLUE ANCHOR WEST was the #16 most polluted bathing area in England & Wales, by duration of sewage overflows, as reported by the water companies

Local Constituency

Pollution Summary 2023

Here are all the reported sewage overflow totals for BLUE ANCHOR WEST in 2023.

If the locations of the sewage outlets look a bit unusual, it is likely that the reporting of the data from the water company is in error. We rely on their data in order to draw these maps.

Accuracy Warning We use data from the water companies, but we are seeing many anomalies, that make us believe that bathing location information is quite poor. The situation is likely far worse than reported here.

Other CSOs may also be located nearby, however the water companies claim that these do not affect the water quality here.

Company Waterway Site Sewage Dumps Duration (Hours) Reporting %
Wessex Water Bristol Channel WATCHET SEWAGE TREATMENT WORKS 73 1,210 100
Wessex Water Washford River BYE FARM COMBINED SEWER OVERFLOW 94 767 99.1
Wessex Water Bristol Channel DONIFORD PUMPING STATION 42 488 99.9
Wessex Water Unknown TUNNEL PUMPING STATION 38 209 100
Wessex Water Pill River BILBROOK PUMPING STATION 36 208 100
Wessex Water River Pill BLUE ANCHOR PUMPING STATION 19 144 100
Wessex Water Pill River OLD CLEEVE FARM CSO 1 0 100

Data Sources & Accuracy

EDM (Event Duration Monitoring) data and Consented Discharges to Controlled Waters with Conditions from Environment Agency & Data Map Wales, and Scottish Water

Experimental derived data from Thames Water API, Some data may be missing or inaccurate. This uses Environment Agency rainfall data from the real-time data API (Beta) - Rainfall data is delayed by up to two days.

This website is intended to provide an accurate representation of the Environment Agency data. The data is hard to use, and thus some errors may have been made. If you find something that is incorrect, please raise an issue at the GitHub issues page and we'll endeavour to fix it quickly.

This project is not associated, approved or endorsed by any of the companies whose logos you see here.